0700 am team is completed.
the timber came yesterday
some of the columns and the braces are ready for roof beam
every single brace is made with a tenon and hold by a nail made of wood; real handcraft
for the roof beam i rent a lil loader for better handling
here i make a mortise for the tenon
all the work is only possible with a good team
aproxx 0900 pm the work was done :-) and i wiped out
but the result looks pretty good - i think
STAY TUNED
Keine Kommentare:
Kommentar veröffentlichen